Whenever a CPSR is considered needed, the ACO is required to measure the contractor’s system against the eleven criteria listed in Considerably 44.(b) In analyzing the acceptability with the contractor’s purchasing system, the contracting officer, in consultation Using the purchasing system analyst or auditor, shall figure out if the contractor